{"id":10726,"date":"2026-02-26T06:47:56","date_gmt":"2026-02-26T06:47:56","guid":{"rendered":"https:\/\/lemonn.co.in\/blog\/?p=10726"},"modified":"2026-02-26T06:58:44","modified_gmt":"2026-02-26T06:58:44","slug":"manilam-industries-ipo-allotment-status-gmp","status":"publish","type":"post","link":"https:\/\/lemonn.co.in\/blog\/ipo\/manilam-industries-ipo-allotment-status-gmp\/","title":{"rendered":"Manilam Industries IPO Allotment Status: Check GMP, Subscription &amp; How to Verify"},"content":{"rendered":"<figure class=\"wp-block-post-featured-image\"><img loading=\"lazy\" decoding=\"async\" width=\"890\" height=\"593\" src=\"https:\/\/lemonn.co.in\/blog\/wp-content\/uploads\/2026\/02\/mainlam-industries-india-ipo-allotment-status.png\" class=\"attachment-post-thumbnail size-post-thumbnail wp-post-image\" alt=\"Manilam Industries India IPO Allotment Status: Check GMP, Subscription &amp; How to Verify\" style=\"object-fit:cover;\" srcset=\"https:\/\/lemonn.co.in\/blog\/wp-content\/uploads\/2026\/02\/mainlam-industries-india-ipo-allotment-status.png 890w, https:\/\/lemonn.co.in\/blog\/wp-content\/uploads\/2026\/02\/mainlam-industries-india-ipo-allotment-status-300x200.png 300w, https:\/\/lemonn.co.in\/blog\/wp-content\/uploads\/2026\/02\/mainlam-industries-india-ipo-allotment-status-768x512.png 768w, https:\/\/lemonn.co.in\/blog\/wp-content\/uploads\/2026\/02\/mainlam-industries-india-ipo-allotment-status-150x100.png 150w\" sizes=\"auto, (max-width: 890px) 100vw, 890px\" \/><\/figure>\n\n\n<p><strong>Manilam Industries India IPO allotment is scheduled for 25 February 2026<\/strong>, and the <strong>listing is on 27 February 2026 on NSE SME<\/strong>. Here\u2019s the verified update on <strong>GMP, final subscription<\/strong>, and exactly <strong>how to check your allotment status<\/strong>.<\/p>\n\n\n\n<h2 id='quick-facts'  id=\"boomdevs_1\" class=\"wp-block-heading\">Quick Facts<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Particulars<\/th><th>Details<\/th><\/tr><\/thead><tbody><tr><td>Exchange<\/td><td>NSE SME<\/td><\/tr><tr><td>IPO Open \/ Close<\/td><td>20 Feb 2026 \u2013 24 Feb 2026<\/td><\/tr><tr><td>Price Band<\/td><td>\u20b965 \u2013 \u20b969<\/td><\/tr><tr><td>Issue Size<\/td><td>\u20b939.95 crore<\/td><\/tr><tr><td>Lot Size<\/td><td>2,000 shares<\/td><\/tr><tr><td>Min Investment<\/td><td>\u20b92,76,000<\/td><\/tr><tr><td>Basis of Allotment<\/td><td>25 Feb 2026<\/td><\/tr><tr><td>Refunds \/ Demat Credit<\/td><td>26 Feb 2026<\/td><\/tr><tr><td>Listing Date<\/td><td>27 Feb 2026<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 id='manilam-industries-ipo-subscription'  id=\"boomdevs_2\" class=\"wp-block-heading\">Manilam Industries IPO Subscription<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Category<\/th><th>Subscription (x)<\/th><\/tr><\/thead><tbody><tr><td>QIB<\/td><td>0.90x<\/td><\/tr><tr><td>NII<\/td><td>12.84x<\/td><\/tr><tr><td>Retail (RII)<\/td><td>5.88x<\/td><\/tr><tr><td><strong>Total<\/strong><\/td><td><strong>4.44x<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<h2 id='manilam-industries-ipo-gmp'  id=\"boomdevs_3\" class=\"wp-block-heading\">Manilam Industries IPO GMP<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table><thead><tr><th>Particulars<\/th><th>Value<\/th><\/tr><\/thead><tbody><tr><td>Issue Price (Upper Band)<\/td><td>\u20b969<\/td><\/tr><tr><td>GMP<\/td><td>\u20b90<\/td><\/tr><tr><td>Estimated Listing Price (GMP-based)<\/td><td>\u20b969<\/td><\/tr><tr><td>Estimated Listing Gain<\/td><td>0%<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\">\n<p>GMP is unofficial and can change quickly; it\u2019s not a guarantee.<\/p>\n<\/blockquote>\n\n\n\n<h2 id='how-to-check-manilam-industries-ipo-allotment-status-step-by-step'  id=\"boomdevs_4\" class=\"wp-block-heading\">How to Check Manilam Industries IPO Allotment Status (Step-by-Step)<\/h2>\n\n\n\n<h3 id='method-1-registrar-mas-services'  id=\"boomdevs_5\" class=\"wp-block-heading\">Method 1: Registrar (MAS Services)<\/h3>\n\n\n\n<ol class=\"wp-block-list\">\n<li>Open <strong>MAS Services<\/strong> IPO allotment\/status page<\/li>\n\n\n\n<li>Select the IPO name (Manilam Industries India Ltd.)<\/li>\n\n\n\n<li>Search using <strong>PAN<\/strong> or <strong>DP\/Client ID<\/strong><\/li>\n\n\n\n<li>Submit to view your allotment result<\/li>\n<\/ol>\n\n\n\n<h3 id='method-2-exchange-route-nse-tools'  id=\"boomdevs_6\" class=\"wp-block-heading\">Method 2: Exchange Route (NSE Tools)<\/h3>\n\n\n\n<p>You can also use NSE\u2019s official IPO bid\/allotment verification tools to validate bid details uploaded by the broker\/bank.<\/p>\n\n\n\n<h3 id='method-3-check-your-demat-broker-app'  id=\"boomdevs_7\" class=\"wp-block-heading\">Method 3: Check Your Demat \/ Broker App<\/h3>\n\n\n\n<p>If allotted, shares typically reflect around the <strong>credit date (26 Feb 2026)<\/strong>.<\/p>\n\n\n\n<h2 id='key-takeaways'  id=\"boomdevs_8\" class=\"wp-block-heading\">Key Takeaways<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Final subscription stood at <strong>4.44\u00d7<\/strong> overall (NII strongest).<\/li>\n\n\n\n<li>GMP was <strong>flat (\u20b90)<\/strong> during the offer period.<\/li>\n\n\n\n<li>Allotment on <strong>25 Feb<\/strong>, listing on <strong>27 Feb<\/strong> (NSE SME).<\/li>\n<\/ul>\n\n\n\n<h2 id='faqs'  id=\"boomdevs_9\" class=\"wp-block-heading\">FAQs<\/h2>\n\n\n<div id=\"rank-math-faq\" class=\"rank-math-block\">\n<div class=\"rank-math-list \">\n<div id=\"faq-question-1772088216517\" class=\"rank-math-list-item\">\n<h3 id='q-when-is-allotment-for-manilam-industries-ipo'  id=\"boomdevs_10\" class=\"rank-math-question \">Q. <strong>When is allotment for Manilam Industries IPO?<\/strong><\/h3>\n<div class=\"rank-math-answer \">\n\n<p>25 Feb 2026.<\/p>\n\n<\/div>\n<\/div>\n<div id=\"faq-question-1772088239596\" class=\"rank-math-list-item\">\n<h3 id='q-where-will-it-list'  id=\"boomdevs_11\" class=\"rank-math-question \">Q. Where will it list?<\/h3>\n<div class=\"rank-math-answer \">\n\n<p>NSE SME on 27 Feb 2026.<\/p>\n\n<\/div>\n<\/div>\n<\/div>\n<\/div>","protected":false},"excerpt":{"rendered":"<p>Manilam Industries India IPO allotment is scheduled for 25 February 2026, and the listing is on 27 February 2026 on NSE SME. Here\u2019s the verified update on GMP, final subscription, and exactly how to check your allotment status. Quick Facts Particulars Details Exchange NSE SME IPO Open \/ Close 20 Feb 2026 \u2013 24 Feb [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":10728,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_ayudawp_aiss_exclude":false,"footnotes":""},"categories":[24],"tags":[],"class_list":["post-10726","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-ipo"],"blocksy_meta":[],"_links":{"self":[{"href":"https:\/\/lemonn.co.in\/blog\/wp-json\/wp\/v2\/posts\/10726","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lemonn.co.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lemonn.co.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lemonn.co.in\/blog\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/lemonn.co.in\/blog\/wp-json\/wp\/v2\/comments?post=10726"}],"version-history":[{"count":2,"href":"https:\/\/lemonn.co.in\/blog\/wp-json\/wp\/v2\/posts\/10726\/revisions"}],"predecessor-version":[{"id":10735,"href":"https:\/\/lemonn.co.in\/blog\/wp-json\/wp\/v2\/posts\/10726\/revisions\/10735"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lemonn.co.in\/blog\/wp-json\/wp\/v2\/media\/10728"}],"wp:attachment":[{"href":"https:\/\/lemonn.co.in\/blog\/wp-json\/wp\/v2\/media?parent=10726"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lemonn.co.in\/blog\/wp-json\/wp\/v2\/categories?post=10726"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lemonn.co.in\/blog\/wp-json\/wp\/v2\/tags?post=10726"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}